In this paper, first transient waves in the gas-insulated substation (GIS) are analyzed and methods for suppression of very fast transients (VFTs) in GISs are introduced. For suppressing VFTs, four methods are presented, including suppression by terminal components, capacitance components, adopting a resistor-fitted disconnector, and ferromagnetic rings. Finally, these approaches are compared with each other. These methods can be divided into two groups. The first group contains the methods (such as terminal components and reconfiguration) that can be used after installation of the GIS and during the operation of the GIS. The second group contains the methods (such as the resistor-fitted disconnector and ferromagnetic rings) that must be used as an extra limitation before installation and during the design of the GIS. Advantages of the first group are simplicity and the low cost of implementation along with producing minimal changes in the installed GIS. The main advantage of the second group is estimation of all factors during the design of the GIS. Finally, the best approach for the suppression of VFTs is chosen based on the criteria of the transient waves and feasibility.
History
Publication title
IEEE Transactions on Power Delivery
Volume
28
Article number
6355990
Number
6355990
Pagination
303-310
ISSN
0885-8977
Department/School
School of Engineering
Publisher
IEEE
Place of publication
USA
Rights statement
Copyright 2012 IEEE
Repository Status
Restricted
Socio-economic Objectives
Mining and extraction of energy resources not elsewhere classified