Investigating the value of keeping options open for water infrastructure in the Lower Hunter, New South Wales
journal contribution
posted on 2023-05-21, 11:50authored bySteven RustSteven Rust, Silberberg, B, Turner, E, Sharp, B
Policy discussions around the world have increasingly focused on the need for resilient water and wastewater systems. The use of small-scale, 'incremental', measures that maintain substitutability in investment choices can improve a system's adaptability. Using past shifts/shocks, we estimate an option value for unforeseen events that can change the yield-demand balance for potable supply. For a hypothetical dam, we find avoided costs ranging from $11.1 m to $78.1 m for amounts of extra time ranging from one to ten years; and for a permanent desalination plant, the avoided costs ranged from $33.6 m up to $234.7 m for the same amounts of extra time.