University of Tasmania
Browse

File(s) under permanent embargo

Lake Pieman - Bobadil discharge zone biomonitoring report 2014

report
posted on 2023-05-25, 06:25 authored by Peter Davies, Cook, LSJ
This report details the 2014 results of the routine annual survey of shore biota in Lake Pieman, based on sampling conducted in autumn (April) 2014. This biological monitoring program assesses the ecological status of the area in Lake Pieman influenced by the discharge from the MMG Rosebery mine Bobadil settling pond facility. Previous surveys at this location, including those for the previous operators (Zinifex, Ozminerals), have been reported for spring and autumn every year from 2004/05 to 2012 (Davies et al. 2005, 2006a, 2006b, 2007 - 2013). The current operator (MMG) is required to report on a single annual survey of lake-shore biota in upper Lake Pieman, so a single autumn sampling was again conducted in 2014.

History

Commissioning body

MMG Rosebery

Department/School

Tasmanian Institute of Agriculture (TIA)

Publisher

MMG Rosebery

Repository Status

  • Restricted

Socio-economic Objectives

Terrestrial systems and management not elsewhere classified

Usage metrics

    University Of Tasmania

    Exports

    RefWorks
    BibTeX
    Ref. manager
    Endnote
    DataCite
    NLM
    DC